AARE CUN TAI THERMAL LTD.

Living by sincerity, diligency and efficiency

Manufacturer from China
Active Member
8 Years
Home / Products / L/LL/KL Type Fin Tube /

L Type Wrapped Around Fin Tube Seamless OD 19.05mm ISO Standard

Contact Now
AARE CUN TAI THERMAL LTD.
Province/State:jiangsu
Country/Region:china
Contact Person:MsApril Guan
Contact Now

L Type Wrapped Around Fin Tube Seamless OD 19.05mm ISO Standard

Ask Latest Price
Video Channel
Brand Name :JYCT
Model Number :L-2
Certification :ISO9001:2008 authorized by SGS
Place of Origin :JIANGSU,CHINA
MOQ :customized
Price :Negotiable
Supply Ability :50 tons per day
Delivery Time :Within 45 days after received your deposits
Packaging Details :Strong plywood case with steel frame
Year Established :2008
Port :Shanghai
Payment Terms :T/T in Advance, or Irrevocable L/C at Sight
Material :Stainless Steel+Stainless Steel, Carbon Steel+Carbon Steel, Alloy+Alloy etc.
Bare Tube OD :16-63mm
Fin Pitch :2.1-5mm
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

L(Wrapped) fin tube:

Base tube material: SA213 TP304 SIZE:OD19.05mm * 1.25mm THK * 3633mm LG
Fin Material: AL1060; OD38.1mm X 275.6FPIX 0.4 mm THK


Manufacturing Process:
The fin is wrapped around the tube and secured at each end. Gives some surface protection to thetube. Used for moderate temperature cooling applications.
Upper temperature limit: 120°C

Reference :


Material: Carbon Steel, Copper Stainless Steel, Alloy, Aluminium
Bare tube OD: 16-63mm Fin Pitch: 2.1-5.0mm Fin Height: <17mm Fin Thick: About 0.4mm

Features:
The winding technology improves production efficiency and heat transfer, makes the average fin pitch and higher proportion between fins and tube. At the same time, the base tube can be protected from air erosion.

NameBase tube
(OD) mm
Fin Pitch
(mm)
length
(m)
MinMaxMinMaxMinMax
Extruded aluminum fin tube8511.6100.520
L/LL/KL aluminum fin tube16632.150.515
Embedded aluminum fin tube16632.150.515
Low fin tube10380.620.520
Spiral fin tube12.770 0.520
ERW HF spiral fin tube162193250.528
ERW HF spiral serrated fin tube162193250.528
Serrated width(mm)
10 min~26 max
Serrated depth(mm)
4 min~16 max
ERW studded tube25219830215
DC ERW H/HH fin tube2563830115
H/HH finsLength(mm)
60 min-150 max
Thickness(mm)
1.5 min~4 max
Width(mm)
30 min~50 max


Application: L-type finned tube mainly used in petrochemical, electric power, tobacco, building heating and other industry such as air cooler, air heater, plant starch spray drying system.

Capacity: 9000 meters/day


Products&Inspection Deatails:


Check fin outer diameter

L Type Wrapped Around Fin Tube Seamless OD 19.05mm ISO Standard


Check the overall length

L Type Wrapped Around Fin Tube Seamless OD 19.05mm ISO Standard


Check the bare tube wall thickness

L Type Wrapped Around Fin Tube Seamless OD 19.05mm ISO Standard



Following documentations should be reviewed & endorsed:
Incoming inspection report for raw material including bare tube/alu.tube / alu. strip / steel strip
Mill test cetification for bare tube
Mill test cetification for fin (alu.tube / alu. strip / steel strip)
Mill test cetification for finned tube
Finned tubes dimension & visual inspection reports

Packaging: sea worthy with plastic cap for each edge of core tube , finned tubes shall be put on the metal frame with wooden walls and plastic layer be considered between tubes rows to avoid damage and deformation of the fins

L Type Wrapped Around Fin Tube Seamless OD 19.05mm ISO Standard



Manufacturing

L Type Wrapped Around Fin Tube Seamless OD 19.05mm ISO Standard

FAQ

About our company
A------We have three company,
1. Aare Cun Tai Thermal Co., Ltd (Hong Kong, China)
2.Jiang Yin Cun Tai Thermal Equipment Co., Ltd (Jiangsu, China)(Mill)
3.Jiang Yin Aare International Trading Co.,Ltd. (for export procedure)
Besides the companies above mentioned, we don’t have any other name.

About Our main business
A------DR(Extruded) / L(Wrapped) / LL(Overlapped) / KL-KLM (Knurled) / G(Embeded) Fin Tube;
High Frequency Welding Fin Tube,Studded Tube, H/HH/Square Fin Tube,Longitudinal Tube;
Elbows, Low Fin Tube,Spiral Tube, U bend , Corrugated Tube.

About Price terms
A------It could be EXW, FOB,CIF,CNF

About Payment Term
A------We usually accept payment by T/T in advance or by L/C available against draft at sight

About Lead Time
A------Usually it takes about 35-45 days after we received your confirmation.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.

About Quality Control
A----
Incoming inspection report for bare tube/alu.tube / alu. strip / steel strip
Mill test cetification for bare tube
Mill test cetification for fin (alu.tube / alu. strip / steel strip)
Mill test cetification for finned tube
Finned tubes dimension & visual inspection reports


About Sample
A---If you are interested in our above products, please contact us.
We can provide small samples in store for you, and you are welcome to visit visit our factory

Our moulds can be customized,you could kindly leave an inquiry to know more details about price, packing and shipping.



















































































Inquiry Cart 0